How Much Does a Cubic Yard of Gravel Cost? Bulk, Bagged & Per-Ton Prices
Bulk gravel runs $40–$70 per cubic yard in 2026, bags run about $243 per yard-equivalent, and delivery adds $50–$150 per trip. Type-by-type prices, the 54-bag math, per-ton conversions, and worked project costs.
By the Cubic Yard Calculator team · Last updated October 2026
All prices are typical US ranges, as of Oct 2026.
The short answer
A cubic yard of bulk gravel costs $40–$70 in 2026 for common landscape and driveway stone (typical US range). Decorative stones — river rock, marble chips — cost more, roughly $60–$120 per yard. Delivery adds $50–$150 per trip, and a home-center bag is a completely different price tier: the standard 50-lb bag holds about 0.5 cubic feet, so a full yard takes 54 bags, which works out to about $243 per yard at $4.50 a bag. The rule of thumb is simple: if you need more than about a quarter of a cubic yard, bulk delivery wins.
Bulk gravel prices by type
Not all gravel is priced alike. Crusher run and road base are quarry staples that need no washing; pea gravel and decorative stone cost more to process, screen, and transport. Here is what a cubic yard of material alone typically costs in 2026, before delivery:
| Gravel type | Price per cubic yard | Best for |
|---|---|---|
| Crusher run / road base (ABC) | $40–$55 | Driveway bases, compactable sub-base |
| #57 stone (¾″ crushed) | $45–$65 | Driveways, drainage, French drains |
| Pea gravel | $45–$65 | Walkways, patios, play areas |
| Decomposed granite | $45–$70 | Paths, xeriscaping, patio surfaces |
| River rock | $60–$120 | Decorative beds, ponds, borders |
| White marble chips | $75–$120 | High-visibility decorative landscaping |
| Crushed concrete (recycled) | $30–$50 | Budget base, environmentally friendly option |
Regional supply dominates these numbers. A yard in a quarry state (Pennsylvania, Texas, Florida) prices at the low end; a yard in a coastal metro that imports aggregate lands at the high end. These ranges aggregate published 2026 figures from HomeGuide ($15–$75/yd bulk) and independent cost calculators ($30–$50/yd for the stone alone, $40–$70/yd delivered), so treat them as the typical band — your local quote may sit slightly outside it.
Bagged gravel math: why bulk wins past ~¼ yard
Home centers sell landscape stone in 40–50 lb bags that hold about 0.5 cubic feet each (the site's STONE_BAG_FT3 constant). A cubic yard is 27 cubic feet, so:
27 ÷ 0.5 = 54 bags per cubic yard. At a typical $4.50 per bag: 54 × $4.50 = $243 per cubic yard.
Compare that to $40–$70 for bulk. Bags carry a 3–6× premium — you are paying for small packaging, pallet handling, and shelf space. At $5–$7 per bag (a common home-center price for decorative stone), the yard-equivalent climbs to $270–$380. Bags are the right call only when you need less than about a quarter to half yard, when a dump truck cannot reach the site, or when you need a specific stone your local yard does not carry in bulk.
The break-even point is worth calculating for your job. Suppose you need half a yard: bags cost 27 × $4.50 = $122, bulk costs $20–$35 plus a $50–$150 delivery fee — so bags win unless you can pick up. At a full yard, bags cost $243 while bulk costs $40–$70 plus delivery; bulk wins even with the priciest trip fee. Somewhere between half a yard and a full yard is the crossover for most homeowners, which is why “a quarter yard of bags, anything more in bulk” is the working rule.
Per-ton equivalents at site densities
Yards sell stone by weight — the weighbridge measures tons, not cubic yards — so you will often be quoted a per-ton price. The conversion uses this site's published densities, which follow ASTM C33 typical loose bulk values:
| Material (site variant) | lbs/yd³ | Tons per yard | $40–$70/yd becomes… |
|---|---|---|---|
| Crushed stone (typical) | 2,800 | 1.40 | $28.57–$50.00 → $29–$50/ton |
| Pea gravel | 2,700 | 1.35 | $29.63–$51.85 → $30–$52/ton |
| River rock | 2,900 | 1.45 | $27.59–$48.28 → $28–$48/ton |
| Decomposed granite | 2,650 | 1.33 | $30.08–$52.63 → $30–$53/ton |
So when a yard quotes you $35 per ton for crushed stone, the math — $35 × 1.40 = $49 per yard — lands squarely inside the bulk range above. If a quote does not, either the stone is premium or the delivery fee is hiding in the price.
One more quoting trap: some yards list an attractive per-ton price and then charge a separate “fuel surcharge” or “environmental fee” at checkout. Always ask for the out-the-door total for your exact yardage before comparing. And if you are ordering multiple materials — gravel for the driveway plus topsoil for the beds, say — get them on one ticket from one yard: many suppliers run one truck with a split load, which means one delivery fee instead of two, often saving you $50–$150 outright.
Delivery fees: the $50–$150 line item
Material price is only half the invoice. Delivery typically runs $50–$150 per trip within a local haul radius (typical US range, as of Oct 2026), and the fee is per load, not per yard. That structure punishes small orders: a $75 delivery fee on 1 yard of $50 stone makes your effective price $125/yd, while the same fee spread over a 10-yard load adds just $7.50/yd.
Watch for three fee structures: (1) a flat trip fee, most common; (2) a delivery minimum — many yards require 2–3 yards minimum or tack on a short-load surcharge; and (3) distance surcharges beyond 15–20 miles, often $1–$3 per yard per extra mile. If you own or can borrow a trailer and the yard is close, self-haul of a few yards is often the cheapest option — a ¾-ton pickup bed holds roughly a yard of stone, well under most payload limits.
Cost by project: worked examples
Material-only costs for common projects, using the $40–$70/yd bulk range. Run your exact dimensions through the gravel calculator to get your order quantity — the worked math below is the same formula it uses (length × width × depth ÷ 27, plus 10% overage).
| Project | Volume | Material cost | With 10% overage |
|---|---|---|---|
| Walkway 3×30 ft @ 3 in | 0.83 yd³ | $33–$58 | $37–$64 |
| Patio base 10×10 ft @ 4 in | 1.23 yd³ | $49–$86 | $54–$95 |
| French drain 50 ft (1×1 ft trench) | 1.85 yd³ | $74–$130 | $81–$143 |
| Driveway 10×40 ft @ 4 in | 4.938 yd³ | $198–$346 | $217–$380 |
| Driveway 12×50 ft @ 4 in | 7.41 yd³ | $296–$519 | $326–$570 |
The driveway row is worth reading twice: 10 × 40 × (4/12) ft = 133.33 ft³ ÷ 27 = 4.938 yd³, and $40–$70/yd prices it at $198–$346. Add 10% overage — 5.43 yards — and the order becomes $217–$380 before delivery. That is the whole budget for a single-layer stone driveway: see our gravel driveway guide for depth choices, and compare stone types in crushed stone vs pea gravel.
When gravel is the wrong buy
Gravel is not always the cheapest way to fill a cubic yard. Three alternatives routinely undercut it:
Crushed concrete (recycled aggregate) at $30–$50/yd runs 20–40% cheaper than virgin crushed stone and compacts just as well for driveway bases, shed pads, and parking areas. It looks industrial, not decorative — but under 2 inches of surface stone, nobody sees it. Crusher run from a quarry direct skips the landscape-yard markup entirely: quarries often sell at $25–$40/yd picked up, 20–30% under retail yard prices, though you will haul it yourself. Decomposed granite at $45–$70/yd costs about the same as gravel but packs into a firm, wheelchair-friendly surface for paths and patios where loose gravel migrates and annoys.
There is also the case for not buying aggregate at all. If your driveway needs only a cosmetic refresh — the base is sound but the surface is thin and gray — a 1-inch top-up of fresh stone costs a fraction of a full rebuild and buys 3–5 years. A 12×40 ft driveway topped at 1 inch needs just 1.48 yd³: $59–$104 of stone. Conversely, if the base is failing (ruts, mud pumping up through the stone), more stone on top is throwing money into a hole — the fix is excavation and a compacted crusher-run base, not a thicker surface layer. Compare the full picture in crushed concrete vs gravel and decomposed granite vs gravel.
Buying tips & common mistakes
Get the delivered quote in writing. Per-yard material price means nothing until the delivery fee, minimum order, and sales tax are on the same quote. Match the stone to the job. Crusher run compacts and locks — it is the driveway base stone; pea gravel is rounded and shifts — it is a surface stone. Buying the wrong type costs twice. Do not order exact volume. Always add 10% overage (the gravel calculator does this by default) — uneven ground, spreading losses, and compaction eat the difference. Ask whether the price is per ton or per yard before comparing quotes — at 1.40 tons/yd³, a $35/ton quote equals $49/yd, not $35. Time it for fall or winter if you can: aggregate prices often dip 10–20% off-peak when construction demand cools. Check for recycled crushed concrete — it runs $30–$50/yd, compacts well, and performs nearly identically to virgin stone for bases and driveways.
Gravel Cost FAQ
Straight answers, no fluff. Then run your own numbers above.
How much does a cubic yard of gravel cost?
Bulk gravel typically costs $40–$70 per cubic yard (typical US range, as of Oct 2026), depending on type and your metro. Crusher run and road base sit at the low end ($40–$55/yd); pea gravel and #57 stone land in the middle ($45–$65/yd); decorative river rock and marble chips cost more ($60–$120/yd). Delivery is usually a separate $50–$150 per trip, and bagged gravel from a home center runs about $243 per cubic yard — so bulk wins on any project over roughly a quarter yard.
How many bags of gravel are in a cubic yard?
54 bags. The standard 50-lb bag of landscape stone holds about 0.5 cubic feet (per the site's STONE_BAG_FT3 constant), and a cubic yard holds 27 cubic feet — so 27 ÷ 0.5 = 54 bags. At a typical $4.50 per bag that is $243 for one cubic yard, versus $40–$70 for the same yard bought in bulk.
How much does gravel cost per ton?
Typical US prices put bulk gravel at roughly $29–$50 per ton. The conversion follows from the site's density constant: crushed stone weighs 2,800 lbs per cubic yard, or 1.40 tons/yd³, so $40–$70 per yard ÷ 1.40 = $28.57–$50 per ton. Pea gravel is slightly lighter at 2,700 lbs/yd³ (1.35 tons), so its per-ton equivalent runs a touch higher for the same per-yard price.
Is it cheaper to buy gravel in bulk or bags?
Bulk is dramatically cheaper once you need more than about a quarter to half a cubic yard. Bagged gravel costs roughly $200–$400 per cubic-yard-equivalent at home-center prices, while bulk gravel runs $40–$70 per yard — bags carry a 3–6× premium. Bags make sense only for small touch-ups, areas a dump truck can't reach, or when you need a specific decorative stone your local yard doesn't stock in bulk.
How much is gravel delivery?
Typically $50–$150 per trip within a local haul radius (typical US range, as of Oct 2026). Many suppliers enforce a delivery minimum of 2–3 cubic yards or a minimum order fee — a $75 flat fee on a single yard effectively doubles your cost. If you have a trailer and a nearby yard, picking up yourself avoids the fee entirely.
How much gravel do I need for a 10×40 driveway at 4 inches?
4.938 cubic yards. The math: 10 × 40 × (4/12) feet = 133.33 cubic feet ÷ 27 = 4.938 yd³. At $40–$70 per yard, the material costs $198–$346; add the standard 10% overage and the order becomes 5.43 yards, or $217–$380. Run your exact dimensions through the gravel calculator to get your order quantity.
References
- HomeGuide 2026 bulk gravel cost data (typical US ranges)
- US supplier price listings, Oct 2026
- ASTM C33 aggregate density ranges
- Site's published density variants (lib/calc.js)
Run your own numbers
Reading is good. Math is better. Punch your project into the free calculator and order with confidence.